Completed: Sept 2023
Location: Boulder City, Nevada
Scale: 128 MWac

The third stage of the Boulder Solar power generation project will supply power to 36,000 households in Nevada as well as contribute to stable power system operation with the construction of an Energy Storage System (ESS). With Boulder Solar stages 1 through 3, 174 Power Global has concluded a contract to supply more than 500MW power with Nevada Energy, a power company serving Nevada residents.